First, short construction period
The biggest advantage of the space frame structure is that all the components can be produced by the factory on-site splicing and installation, for the general scale of the smaller industrial plant only 45 days to 2 months, while if the reinforced concrete building is to be 8 to 12 months or so.
Second, good seismic performance
As the space structure is a flexible structure, light weight, and thus can effectively reduce the degree of seismic response and the impact of disasters, is extremely conducive to anti-seismic.
Third, easy to dismantle and relocate
Space frame steel structure building can be dismantled and relocated in a very short time with minimal loss, which is not possible with reinforced concrete building.
It is because of the many advantages of space frame structure, and with the continuous emergence of new products of fire prevention and anti-corrosion in recent years, it has better solved the shortcomings of poor corrosion resistance of lightweight steel structure, which makes it widely used in industrial plants as well as civil facilities.
LF is professional manufacturer and engineering company for space frame and steel structure project with full capability of research, design fabrication, construction, supervision service for oversea project. Do you have a construction project we can help with? We are always ready to help you!
Email: marketing@lfspaceframe.com
Phone/Whatsapp:86 17751936871
Website: https://www.lfspaceframe.com/